View Single Post
Old February 12, 2016   #34
Worth1
Tomatovillian™
 
Worth1's Avatar
 
Join Date: Feb 2006
Location: Den of Drunken Fools
Posts: 38,539
Default

Quote:
Originally Posted by pecker88 View Post
I hate quoting myself, but... I'm P*****, there was a snafu down at City Hall today. Took the required 3 sets of plans (they are one page back on this thread) along with bldg. permit form.

I was told that since there is no building code for greenhouses, they all have to be stamped by an engineer.

The irony is that I work for an engineering firm, but none of my co-workers are registered in Nebr. so they cannot stamp my drawings. I have a few more contacts, but after their review, I'm sure there will be some modifications.

I'll updated after the architectural review.
That blows where I live the guy that signs off knows me and it takes like 5 minutes or less.
I also have his personal cell phone number but he is not a hick by any stretch of the imagination.
He will come out and inspect your work.

Worth
Worth1 is offline   Reply With Quote